Skip to content

Guide September 21, 2026

The 30 days before move-in: a landlord checklist

What actually has to happen between an approved application and a set of keys changing hands. Five dates, in order, with the paperwork that has to clear before each one and the two items first-time landlords almost always leave until the morning of.

What you'll learn

  • Sign the lease and collect the money
  • Get the unit ready to photograph
  • Utilities, keys, and the disclosures
  • The move-in condition report
  • Move-in day itself
On this page

Put five dates on the calendar the day an application is approved. Lease out for signature. Funds cleared. Turn work finished. Condition report done. Keys handed over. Every item below hangs off one of those five.

First tenancies rarely go wrong because of the tenant. They go wrong because the landlord finds out on move-in morning that the water account is still in their own name, the smoke detector in the hall has no battery, and nobody photographed the unit. Thirty days is plenty of time to do this properly. It is not enough time to do it twice.

Days 30 to 21: sign the lease and collect the money

Send the lease before you do anything else on this list. A tenant who has not signed is not a tenant yet, and turn work done for someone who walks is money gone.

Three things settle in this window.

The lease. Get the term, the rent, the due date, the late fee, and the deposit amount right on the first pass, because amending a signed lease means a second signature from everyone. Fees are where new landlords get into trouble: a late charge has to be a reasonable estimate of what a late payment actually costs you, and several states cap it outright. The lease builder puts the governing code section next to the field it constrains, so a number that is out of bounds is visible while you are typing it rather than a year later. It currently supports California leases only.

Step 10 of the lease wizard, the recommended clauses list, with the late payment charge and returned check fee clauses expanded to show their fee fields.
The clause step shows which clauses are recommended for this lease and puts the governing code section next to the fields it constrains.

The deposit. Confirm the cap in your state before you name a number, because the caps moved recently in several places and an over-collected deposit is a penalty claim waiting to happen. Run the amount through the security deposit calculator and write down where the money will sit.

Cleared funds. First month plus deposit, and cleared means cleared. A personal check that has been deposited is not cleared. Cashier’s check, certified funds, or an ACH transfer that has settled are the three that hold up. Handing keys against a pending payment is the single most expensive habit in small-landlord renting.

Days 20 to 11: get the unit ready to photograph

This is the turn window, and the standard to work to is not “clean enough.” It is photographable, because at the end of the tenancy your move-in photos are the baseline every deduction argument runs through.

Work in this order:

  1. Anything that needs a permit or a specialist. Water heater, panel work, roof, HVAC. These have lead times and they block everything downstream.
  2. Anything that leaks or does not close. Faucets, supply lines, toilet flappers, window locks, exterior door hardware.
  3. Life safety. Smoke alarms in every sleeping room and on every level, carbon monoxide alarms where required, fresh batteries in all of them, and a written note of the date you installed them.
  4. Paint and patch. Do it before the deep clean, not after.
  5. Deep clean, floors last.

Then walk the unit yourself with a notepad, at the time of day the tenant will see it first. Morning light finds things ceiling fixtures hide.

Days 10 to 4: utilities, keys, and the disclosures

The unstructured week. It is also where the items that create liability sit, so give it more attention than it seems to deserve.

Utilities. Write down every account, the provider, the account number, and the transfer date. Anything the tenant pays transfers effective the lease start date, not the move-in date, and those are not always the same day. Anything you pay stays in your name. Call each provider rather than using a web form, and get a confirmation number.

Keys and access. Rekey between tenancies. Every time. Count what you hand over: unit keys, mailbox key, building fob, garage remote, gate code, storage padlock. Write the count into the lease or the key receipt so a missing fob at move-out is an arithmetic question instead of an argument.

Disclosures. These are federal, state, and often city, and they are the part of the file an attorney reads first. The federal one applies to nearly every older building in the country.

40 CFR 745.113(b): a lease for target housing (most residential housing built before 1978) must include a lead warning statement, the landlord’s disclosure of known lead-based paint or hazards, a list of any related records or reports provided, and the lessee’s acknowledgment of receiving the federally approved lead hazard pamphlet, signed by everyone.

State disclosures stack on top of that, and the list is longer than most landlords expect. California alone requires a set that runs to a dozen items depending on the building; the current list is on the California lease disclosures page. Attach them to the lease rather than mailing them separately, so one signature covers the whole packet.

The last 72 hours: the move-in condition report

Do the condition report after the turn work is finished and before the tenant’s furniture arrives. An empty, clean unit is the only state in which the report means anything.

Go room by room and rate every area, including the ones nothing is wrong with. A report that lists only defects reads as a complaint list; a report that rates all 50 lines and finds 3 problems reads as a record. Photograph as you go.

California now writes the photography into statute, and the dates are worth knowing even if you rent elsewhere, because they describe the practice everyone should already follow.

Cal. Civ. Code § 1950.5(g)(1)

for tenancies that begin on or after July 1, 2025, the landlord shall take photographs of the unit immediately before, or at the inception of, the tenancy.

Send the report to the tenant with a deadline to respond, item by item, and keep whatever they write back. The disagreements are more useful than the agreements: a tenant who marks the hall closet door as poor when you rated it fair has just documented a defect you can never be charged for. The full argument for why this is the highest-return hour of the tenancy is in the move-in checklist that settles most deposit disputes.

Move-in day itself

Short list, because by now the work is done.

  • Meet in person if you can. Fifteen minutes of face time buys a year of easier texts.
  • Walk the unit together and show, physically, where the water shutoff, the panel, and the filter are. Say it out loud and write it in the welcome note.
  • Hand over the keys against the count you wrote down, and have the tenant initial it.
  • Give them the report and photos in a form they can keep, not a link that expires.
  • Tell them how to submit a repair request, and tell them what counts as an emergency.

Then leave. Do not linger, do not inspect, and do not come back next week to check on anything. The tenant has exclusive possession now, and in most states you need advance written notice to enter at all. California treats 24 hours as the presumptive standard.

Cal. Civ. Code § 1954(d)(1)

the landlord shall give the tenant reasonable notice in writing of the intent to enter, stating the date, approximate time, and purpose, and enter only during normal business hours. Twenty-four hours is presumed to be reasonable notice in the absence of evidence to the contrary.

The first week after

Two follow-ups, both short. On day three, ask whether anything is not working. On day seven, confirm the utility transfers actually happened, because providers miss them and the bill that arrives in your name six weeks later is a nuisance to unwind.

File the whole packet in one place: signed lease, disclosures, condition report, photos, key receipt, utility confirmations. Condition reports in LeaseRooster keep the move-in record attached to the lease it belongs to, so the file is still findable three years and two tenants later.

This is general information, not legal advice. Rules change and local ordinances vary. Confirm current requirements with your city, county, or an attorney before you act.

Common questions

What does a landlord need to do before a tenant moves in?

Get the lease signed, collect cleared funds for the first month and the deposit, finish the turn work, deliver the federal and state disclosures, transfer the utilities, rekey and count the keys, and complete a photographed condition report in the empty unit before the furniture arrives.

How long before move-in should a landlord start preparing?

About thirty days. Permit work and specialist trades have lead times that block the cleaning and painting behind them, and utility transfers need a week of slack because providers miss dates.

Should the landlord or the tenant put the utilities in their name?

Whatever the lease says, effective the lease start date rather than the move-in date when those differ. Call each provider instead of using a web form, keep the confirmation number, and check in week one that the transfer actually happened.

Start the tenancy with a real record

LeaseRooster drafts the move-in condition report room by room when a lease activates, sends it to the tenant with a response deadline, and files it against the lease.